Float (or slack) in a project schedule represents:

Project Management (PMP) Medium

Project Management (PMP) — Medium

Float (or slack) in a project schedule represents:

Key points

  • Float is a time-based concept, not cost-based
  • It affects the project timeline, not resource allocation
  • Buffer time is specific to each activity, not the entire project
  • Float is calculated based on the critical path method